Du, Jing, Wang, Qi, and Shi, Qian. Description–experience gap under imperfect information: Information continuum and aggressive cost estimating in capital projects. Retrieved from https://par.nsf.gov/biblio/10096565. Engineering, Construction and Architectural Management . Web. doi:10.1108/ECAM-02-2018-0075.
Du, Jing, Wang, Qi, & Shi, Qian. Description–experience gap under imperfect information: Information continuum and aggressive cost estimating in capital projects. Engineering, Construction and Architectural Management, (). Retrieved from https://par.nsf.gov/biblio/10096565. https://doi.org/10.1108/ECAM-02-2018-0075
Du, Jing, Wang, Qi, and Shi, Qian.
"Description–experience gap under imperfect information: Information continuum and aggressive cost estimating in capital projects". Engineering, Construction and Architectural Management (). Country unknown/Code not available. https://doi.org/10.1108/ECAM-02-2018-0075.https://par.nsf.gov/biblio/10096565.
@article{osti_10096565,
place = {Country unknown/Code not available},
title = {Description–experience gap under imperfect information: Information continuum and aggressive cost estimating in capital projects},
url = {https://par.nsf.gov/biblio/10096565},
DOI = {10.1108/ECAM-02-2018-0075},
abstractNote = {},
journal = {Engineering, Construction and Architectural Management},
author = {Du, Jing and Wang, Qi and Shi, Qian},
}
Warning: Leaving National Science Foundation Website
You are now leaving the National Science Foundation website to go to a non-government website.
Website:
NSF takes no responsibility for and exercises no control over the views expressed or the accuracy of
the information contained on this site. Also be aware that NSF's privacy policy does not apply to this site.