<?xml-model href='http://www.tei-c.org/release/xml/tei/custom/schema/relaxng/tei_all.rng' schematypens='http://relaxng.org/ns/structure/1.0'?><TEI xmlns="http://www.tei-c.org/ns/1.0">
	<teiHeader>
		<fileDesc>
			<titleStmt><title level='a'>Topology Identification of Distribution Networks Using A Split-EM based Data-Driven Approach</title></titleStmt>
			<publicationStmt>
				<publisher></publisher>
				<date>2022 Spring</date>
			</publicationStmt>
			<sourceDesc>
				<bibl> 
					<idno type="par_id">10303835</idno>
					<idno type="doi">10.1109/TPWRS.2021.3119649</idno>
					<title level='j'>IEEE Transactions on Power Systems</title>
<idno>0885-8950</idno>
<biblScope unit="volume"></biblScope>
<biblScope unit="issue"></biblScope>					

					<author>Li Ma</author><author>Lingfeng Wang</author><author>Zhaoxi Liu</author>
				</bibl>
			</sourceDesc>
		</fileDesc>
		<profileDesc>
			<abstract><ab><![CDATA[To improve the topology observability in power distribution networks (PDNs), a two-stage topology identification framework is proposed to recognize the mixed topologies in a large set of historical data and predict the real-time topology based on the nodal measurements. A split expectationmaximization (split-EM) method is proposed considering the measurement errors to deal with the topology identification problem on the historical batch data, in which the number of topology categories does not need to be given in advance. Based on the topology identification results of historical data, the number of topology categories is reduced. Then, feasible classifiers are trained using machine learning methods to predict the real-time topology efficiently. An error-correcting mechanism is proposed for the real-time identification involving the credibility analysis and the reidentification based on the Bayesian recursion model. Finally, via a practical example, the effectiveness of the proposed models is verified by efficiently identifying the PDN's topologies in both the historical batch data with mixed topologies and real-time measurements. In addition, the partitionbased extension application solution of the topology identification models for large-scale PDNs is proposed without extra measurements to relieve the calculation burden and reduce the identification time notably while maintaining the accuracy as the non-partitioned scheme.]]></ab></abstract>
		</profileDesc>
	</teiHeader>
	<text><body xmlns="http://www.tei-c.org/ns/1.0" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:xlink="http://www.w3.org/1999/xlink">
<div xmlns="http://www.tei-c.org/ns/1.0"><head>I. INTRODUCTION</head><p>he power distribution network (PDN) is different from the transmission grids where the topologies are regularly measured and verified. Topology information of distribution networks is inaccurate or even unavailable due to uninformed changes that happen from time to time, such as network reconfiguration, repairs, maintenance and load balancing <ref type="bibr">[1]</ref>. Although topology sensors (such as Feeder Terminal Unit, FTU) are being utilized in PDNs, they are placed only at special locations due to budget constraints <ref type="bibr">[2]</ref>. Topology identification in PDNs is critical due to its important roles in carrying out many tasks, including power flow analysis, real-time contingency analysis, resiliency enhancements against natural disasters or cyber-physical attacks, efficient integration of renewable energy sources (RES), and so on <ref type="bibr">[3]</ref><ref type="bibr">[4]</ref><ref type="bibr">[5]</ref><ref type="bibr">[6]</ref>.</p><p>The importance of topology identification to power grids is receiving growing attention, and some related research has been performed in the past few years based on the ongoing deployment of advanced metering infrastructures (AMI), microphasor measurement unit (&#956;PMU)-type sensors <ref type="bibr">[7]</ref> and GPS timing devices <ref type="bibr">[1]</ref> at the buses. The existing research on power grid topology identification problems can be classified into static models <ref type="bibr">[1,</ref><ref type="bibr">2,</ref><ref type="bibr">[8]</ref><ref type="bibr">[9]</ref><ref type="bibr">[10]</ref> and time-varying models <ref type="bibr">[3,</ref><ref type="bibr">[11]</ref><ref type="bibr">[12]</ref><ref type="bibr">[13]</ref><ref type="bibr">[14]</ref><ref type="bibr">[15]</ref><ref type="bibr">[16]</ref>, depending on whether the grid topology is fixed or not during the computation. For the static models, reference <ref type="bibr">[1]</ref> proposed an error-in-variables model to jointly estimate the line parameter and topology in a maximum-likelihood framework. Reference <ref type="bibr">[2]</ref> proposed a mutual information-based topology identification model for the distribution grid with new data from sensorequipped DER devices. Reference <ref type="bibr">[8]</ref> proposed a structure learning algorithm to solve the topology estimation problem in structurally meshed but operationally radial distribution networks. Reference <ref type="bibr">[9]</ref> proposed a topology identification algorithm based on the measurements from a few line current sensors, and the problem was modeled as a mixed integer linear program (MILP). Reference <ref type="bibr">[10]</ref> used the Markov Random Field algorithm to explore the nodal correlation, and a revised maximum likelihood method was devised to solve the model. Then for the time-varying models, the research is composed of real-time identification with single topology <ref type="bibr">[3,</ref><ref type="bibr">[11]</ref><ref type="bibr">[12]</ref><ref type="bibr">[13]</ref><ref type="bibr">[14]</ref><ref type="bibr">16]</ref>, and historical identification with multiple topologies <ref type="bibr">[15]</ref>. For realtime topology identification, the sparse-recovery methods were utilized in <ref type="bibr">[3]</ref> and <ref type="bibr">[11]</ref> to solve the smart grid topology identification problems, where the power network was regarded as an interconnected graph and the DC power flow model was considered. A "Learning-to-Infer" method was developed in <ref type="bibr">[12]</ref> for identifying the line status of the power network efficiently in real time, and the line outage detector optimization was solved as a discriminative learning model. Reference <ref type="bibr">[13]</ref> proposed a model for identifying network changes based on the Bayesian approach, and the model was tested on the 11 kV distribution networks of the U.K. Generic Distribution System (UKGDS). Reference <ref type="bibr">[14]</ref> studied the parameters and topology estimation problem in a polyphase distribution network via the least absolute shrinkage and selection operator (LASSO) regression. Reference <ref type="bibr">[16]</ref> proposed a distribution network dynamic topology awareness method that only requires the synchronized voltage amplitude measurements of a few nodes in the grid. In <ref type="bibr">[15]</ref>, the authors improved their previous static state framework for the single topology identification in <ref type="bibr">[1]</ref>, and a parameter and topology joint identification model was proposed. In addition to the topology identification, references <ref type="bibr">[17,</ref><ref type="bibr">18]</ref> also addressed the phase identification problem using a maximum marginal likelihood estimation and an MILP model, respectively.</p><p>In general, the distribution network is structurally meshed but operationally radial. To overcome the drawbacks of the radial systems, prevent service interruptions, and reduce losses, the meshed configuration has been studied <ref type="bibr">[19,</ref><ref type="bibr">20]</ref>. In recent years, the large-scale integration of RES has also brought great changes to the distribution systems, and the conceptions such as microgrid and energy hub have also been implemented <ref type="bibr">[21,</ref><ref type="bibr">22]</ref>. Accordingly, the partially islanding operation mode will also be adopted in the distribution networks under some circumstances. Considering these changes, the topology identification tools for distribution networks should be applicable to diversified network topologies. Several models in the existing literature have considered the meshed configuration <ref type="bibr">[1,</ref><ref type="bibr">14]</ref>, but the networks with islands have seldom been considered. In addition, most of the existing studies assumed that the collected data samples correspond to the same topology <ref type="bibr">[23]</ref><ref type="bibr">[24]</ref><ref type="bibr">[25]</ref><ref type="bibr">[26]</ref>. However, the network topology changes can happen rather frequently in the distribution system operation, as much as once every several hours <ref type="bibr">[27]</ref>. These topology changes can be induced by the routine reconfiguration, manual maintenance, etc. <ref type="bibr">[2]</ref>, and it is not easy to determine when and how the topology changes. Thus, the number of topology categories for a set of historical measurement data is usually unknown in practice, and identifying the mixed topologies in a large set of historical data simultaneously is a challenging task. Moreover, as the historical and real-time topology identifications were realized separately in the existing literature, the historical topology information has not been fully exploited in the real-time topology prediction, and in some cases the labeled data has to be generated artificially. To date, an integrated framework involving both historical and realtime topology identification has not been researched. In this context, this paper proposes a two-stage topology identification framework for PDNs to recognize the mixed topologies in historical batch data and predict the real-time topology based on the available nodal measurements. The measurements include nodal active/reactive power injections, voltage amplitudes and phase angles, where the voltage phase angles are measured by low-cost &#956;PMUs <ref type="bibr">[28]</ref>, and other measurement are obtained from widely-used smart meters <ref type="bibr">[29]</ref>. The main contributions of the paper are listed as follows:</p><p>1) A modified EM algorithm named split-EM is proposed for historical batch data topology identification, where the number of topology categories in the historical data is not necessary. For a data sample including multiple records, the proposed model can simultaneously find all the topology categories and identify the topology each record belongs to. It is applicable to different types of topologies, including radial, meshed, and islanded networks; and different system models, such as three-phase balanced systems and unbalanced systems. Further, it is also applicable when the nodal voltage phase angles are not measured.</p><p>2) A two-stage topology identification framework is proposed based on the split-EM historical identification, in which the number of the topology categories could be narrowed down.</p><p>Then the classifiers are trained using machine learning methods and adopted in the real-time topology prediction more efficiently.</p><p>3) An extension application solution of the topology identification models for large-scale networks is designed without any extra measurements. By partitioning the network into subsystems, the calculation burden is reduced. The overall topology information can be obtained dynamically and efficiently with the proposed solution.</p><p>This rest of the paper is organized as follows. The overall twostage topology identification framework is introduced in section II. The historical and real-time topology identification models are proposed in section III. In section IV, the application solution of the proposed models for large-scale networks is designed. The case study is presented in section V. Lastly, the conclusions are drawn in section VI.</p></div>
<div xmlns="http://www.tei-c.org/ns/1.0"><head>II. TWO-STAGE TOPOLOGY IDENTIFICATION FRAMEWORK</head><p>The two-stage topology identification framework is shown in Fig. <ref type="figure">1</ref>. In stage I, for historical data identification, the unlabeled records can be divided into several smaller samples (each sample includes a number of records, and one record refers to the nodal measurements at a point in time), and the topology identification operations can be performed with the split-EM method in a parallel way to improve the efficiency. For each record [&#119904;&#119904; &#119894;&#119894;&#119894;&#119894; , &#119910;&#119910; &#119894;&#119894;&#119894;&#119894; ], it is the nodal measurements of all nodes in the PDN at a point in time, and &#119904;&#119904; &#119894;&#119894;&#119894;&#119894; includes the voltage amplitudes and phase angles, while vector &#119910;&#119910; &#119894;&#119894;&#119894;&#119894; includes the active and reactive power injections. The topology category &#119879;&#119879; &#119894;&#119894;&#119894;&#119894; is determined after the topology identification procedure is performed, which is added to the original record to generate the labeled data [&#119904;&#119904; &#119894;&#119894;&#119894;&#119894; , &#119910;&#119910; &#119894;&#119894;&#119894;&#119894; , &#119879;&#119879; &#119894;&#119894;&#119894;&#119894; ].</p><p>The machine-learning training will be carried out to generate several topology classifiers with all the historical labeled data. The inputs of the classifiers are the nodal measurements and the output is the corresponding topology categories. The trained classifiers will be used in stage II for real-time identification. The real-time measurement (similar to one record in the history data) can be labeled using the trained classifiers, and the credibility analysis is performed to prevent the rare occasions that the classifiers cannot correctly label some measurements under new topology parameters (which may never appear in the historical data). Based on the result of the credibility analysis, the credible labeled data will be sent to the historical labeled database to update the machine-learning training of the classifier, while the unreliable data will be reidentified using the Bayesian recursion model, which will take a longer time than the classifier.</p></div>
<div xmlns="http://www.tei-c.org/ns/1.0"><head>III. HISTORICAL AND REAL-TIME TOPOLOGY IDENTIFICATION</head></div>
<div xmlns="http://www.tei-c.org/ns/1.0"><head>A. Historical Topology Identification 1) The EM model</head><p>When the topology information is unknown, the topology identification problem of the historical data can be regarded as an unsupervised classification problem. The unsupervised classification of historical data can further be considered as a parameter estimation problem with unknown mixture of topology categories. The historical data identification model should integrate topology estimation and category selection in one algorithm, and also be applicable when there is a great variety of topology categories in a large-scale network. The inputs of the model are the nodal historical measurements including the active and reactive power injections, voltage amplitudes and phase angles in the PDN, and the output is the corresponding topology categories for all the measurement records. The parameters in the historical topology identification problem can be represented as &#120611;&#120611; = {(&#119879;&#119879; &#119898;&#119898; , &#120572;&#120572; &#119898;&#119898; ), &#119898;&#119898; &#8712; [1,2, &#8230; , &#119872;&#119872;]}, where M is the total number of the topology categories, and &#120572;&#120572; &#119898;&#119898; is the proportion of the records with the mth topology category in the sample, &#119879;&#119879; &#119898;&#119898; is the topology parameter vector of the m-th category, representing the states of the lines with unknown connectivity. &#119879;&#119879; &#119898;&#119898; 's dimension is the number of lines with unknown states. The element of &#119879;&#119879; &#119898;&#119898; is binary which equals 1 if the corresponding line is connected, and 0 otherwise. </p><p>The parameters of mixture models can be estimated using the expectation-maximization (EM) algorithm <ref type="bibr">[31]</ref>, which is an iterative method to find the maximum likelihood of parameter estimates in the statistical models depending on the unobserved latent variables (which are the states of the lines with unknown connectivity here). The EM iteration alternates between the expectation step (E-step) and maximization step (M-step). The E-step creates a function for the expectation of the loglikelihood evaluated using the current parameter estimation results, and the M-step maximizes the expected log-likelihood function determined in the E-step. The E-step and M-step for estimating the parameters &#120553;&#120553; = {(&#120572;&#120572; &#119898;&#119898; , &#119879;&#119879; &#119898;&#119898; ), &#119898;&#119898; &#8712; <ref type="bibr">[</ref> </p><p>The variables in the optimization problem <ref type="bibr">(9)</ref> of the M-step are {(&#119879;&#119879; &#119898;&#119898; )}, &#119898;&#119898; &#8712; [1,2, &#8230; , &#119872;&#119872;] , and the evaluation of p(&#119909;&#119909; &#119894;&#119894; , &#119879;&#119879; &#119894;&#119894; ; &#120611;&#120611;) is closely related to the power flow calculation, which will be introduced in detail in section III-B. Then the model in ( <ref type="formula">9</ref>) is a nonlinear integer programming problem, which is also a non-convex problem. The convergence analysis for the EM algorithm can be referred to <ref type="bibr">[32]</ref>. A common issue associated with the EM algorithm is the local optimum problem <ref type="bibr">[33]</ref>. In other words, if the logarithmic likelihood function has multiple peaks, the EM process is easy to fall into a local optimal solution. In topology identification studies, it seems unlikely that two topologies have the same logarithmic likelihood values for certain records, which means multiple peaks are almost impossible in the topology identification problem (this statement will also be verified in the case study section). Then, it is assumed that &#119819;&#119819;(&#119935;&#119935;; &#120611;&#120611;) will not get the same value between all the possible topology parameters &#120611;&#120611; in this paper. Regarding &#120611;&#120611; as the variable, the logarithmic likelihood function can be sorted in an ascending order, and the realization of the EM process can be depicted in Fig. <ref type="figure">2</ref>.</p><p>As shown in Fig. <ref type="figure">2</ref>, the EM algorithm starts from a randomly given parameter vector &#120611;&#120611; &#120782;&#120782; , then &#119876;&#119876; 1 can be determined using expression <ref type="bibr">(7)</ref>. Based on &#119876;&#119876; 1 , we can get function &#119819;&#119819; * (&#119935;&#119935;, &#120611;&#120611;; &#119876;&#119876; 1 ) , and &#120611;&#120611; &#120783;&#120783; can be solved by optimizing &#119819;&#119819; * (&#119935;&#119935;, &#120611;&#120611;; &#119876;&#119876; 1 ). This process is repeated until &#120611;&#120611; &#119950;&#119950;&#119950;&#119950;&#119950;&#119950; is found.</p><p>2) The split-EM model</p><p>The EM-based topology identification model introduced above is suitable for the case with known number of topology categories. As mentioned in section I, the number of topology categories may not be available in practice when a group of historical data is given. To deal with this problem, we propose a modified EM algorithm named split-EM in this paper. The procedure of the proposed split-EM method is shown in Fig. <ref type="figure">3</ref>. In the procedure, &#119896;&#119896; is the round number in the split-EM process, and &#119866;&#119866; &#119896;&#119896; is the number of the topology categories in the k-th round. The whole procedure will start from &#119896;&#119896; = 1, &#119866;&#119866; &#119896;&#119896; = 2. The aforementioned EM process is performed in the beginning of each round, and the estimated parameters {(&#119879;&#119879; &#119898;&#119898; , &#120572;&#120572; &#119898;&#119898; )}, &#119898;&#119898; &#8712; [1, &#8230; , &#119866;&#119866; &#119896;&#119896; ] are obtained. Then we judge whether two categories hold the same topology parameters, and if there exist any two categories i and j satisfying &#119879;&#119879; &#119894;&#119894; = &#119879;&#119879; &#119894;&#119894; , &#120572;&#120572; &#119894;&#119894; is set to be &#120572;&#120572; &#119894;&#119894; + &#120572;&#120572; &#119894;&#119894; , and &#120572;&#120572; &#119894;&#119894; is set to be 0. If no two categories hold the same topology parameters, we proceed to decide if there exists any category x with &#120572;&#120572; &#119909;&#119909; = 0 . If there exists a category with &#120572;&#120572; &#119909;&#119909; = 0, the split-EM process is ended, and the final parameter results are {(&#119879;&#119879; &#119898;&#119898; , &#120572;&#120572; &#119898;&#119898; )}, &#119898;&#119898; &#8712; [1, &#8230; , &#119866;&#119866; &#119896;&#119896; ] with the x-th category's parameters removed. If there doesn't exist any category x with &#120572;&#120572; &#119909;&#119909; = 0 , the process goes to the next round. A specified ks-th category is chosen to split in the next round based on a judgement index as expressed in expression <ref type="bibr">(10)</ref>, when the ks-th category holds the smallest J index among all the topology categories in the current round. The topologies' parameters except the ks-th category are retained in the new round, which means {&#119879;&#119879; &#119898;&#119898; }\&#119879;&#119879; &#119896;&#119896;&#119896;&#119896; , &#119898;&#119898; &#8712; [1, &#8230; , &#119866;&#119866; &#119896;&#119896; ] is fixed in the new round of the EM process, while {&#120572;&#120572; &#119898;&#119898; }, &#119898;&#119898; &#8712; [1, &#8230; , &#119866;&#119866; &#119896;&#119896;+1 ] still need to be estimated. The split-EM is continued until the termination condition is satisfied. The judgement index of the j-th group is expressed as follows to reflect the credibility of &#119879;&#119879; &#119894;&#119894; .</p><p>&#119879;&#119879; &#119895;&#119895; &#119925;&#119925; &#119946;&#119946;=&#120783;&#120783; <ref type="bibr">(10)</ref> </p></div>
<div xmlns="http://www.tei-c.org/ns/1.0"><head>Remark: Comparison between the split-EM and EM algorithms</head><p>The computational complexity of the EM algorithm is O(NM) for every iteration <ref type="bibr">[34]</ref>, where N is the number of the records and M is the number of the topology categories. For the split-EM process, 2 topology categories need to be identified in each round as other topology categories are determined according to the results of the previous round. Then the computational complexity for one iteration of all the rounds can be expressed as O(2NM) (the number of rounds is equal to the total number of topology categories M). In the traditional EM algorithm, if we try from 2 topology categories to (M+1) topology categories, the computational complexity for one iteration of all the rounds can be expressed as O(2N+3N+&#8230;+(M+1)N)= O(N&#119872;&#119872;(&#119872;&#119872; + 3)/2), which is greater than or equal to O(2NM) in the split-EM method when M &#8805; 2. The gap between the split-EM and traditional EM will be more obvious when M is larger.</p></div>
<div xmlns="http://www.tei-c.org/ns/1.0"><head>B. Probability Density Calculation</head><p>This section mainly focuses on how to determine the probability of a data record belonging to a specified topology category, which is an important element in the split-EM process. 1) Three-phase balanced system For the three-phase balanced power system, we usually use one single phase to represent the overall system. Then the AC power flow equations with the line states are expressed as follows <ref type="bibr">[1]</ref>:</p><p>where &#119901;&#119901; &#119894;&#119894; and &#119902;&#119902; &#119894;&#119894; are the active and reactive power injections at the i-th node, &#119892;&#119892; &#119894;&#119894; and &#119887;&#119887; &#119894;&#119894; are the conductance and susceptance on the j-th line, &#119907;&#119907; &#119894;&#119894; and &#120579;&#120579; &#119894;&#119894; are the voltage amplitude and phase angle at the i-th node, &#119898;&#119898; &#119890;&#119890; is the total number of lines. &#119897;&#119897; &#119894;&#119894;&#119894;&#119894; is the element in the incidence matrix L of PDN, &#119897;&#119897; &#119894;&#119894;&#119894;&#119894; &#8712; {1, -1,0} represents the j-th line leaves from, enters, or separates from the i-th node, respectively. &#119906;&#119906; &#119894;&#119894;1 , &#119906;&#119906; &#119894;&#119894;2 are the elements in the incidence matrix u of PDN,</p><p>Remove the x-th group from {T m ,&#945; m }&#65292;and save the other groups as the final result</p></div>
<div xmlns="http://www.tei-c.org/ns/1.0"><head>Yes</head></div>
<div xmlns="http://www.tei-c.org/ns/1.0"><head>No</head><p>Find the ks-th group with the smallest J index . where &#119906;&#119906; &#119894;&#119894;1 and &#119906;&#119906; &#119894;&#119894;2 represent "from" and "to" node numbers of the j-th line. The power flow equations for all the nodes can also be expressed as the following:</p><p>[&#119953;&#119953;, &#119954;&#119954;] = &#119945;&#119945;(&#119959;&#119959;, &#120637;&#120637;) (13) where the power flow function &#119945;&#119945; corresponds to a specified topology.</p><p>In expression (2), p&#65533;&#119909;&#119909; &#119894;&#119894; &#65533;&#119879;&#119879; &#119894;&#119894; ; &#120611;&#120611;&#65533; is a multi-dimensional density model corresponding to the j-th topology category. &#119879;&#119879; &#119894;&#119894; represents the topology parameters in the j-th category (the line parameters such as length and impedance are known, only the connection states will be considered here). We use p&#65533;&#119909;&#119909; &#119894;&#119894; &#65533;&#119879;&#119879; &#119894;&#119894; &#65533; to replace p&#65533;&#119909;&#119909; &#119894;&#119894; &#65533;&#119879;&#119879; &#119894;&#119894; ; &#120611;&#120611;&#65533; for simplicity in the following section. </p><p>Using the first order Taylor expansion <ref type="bibr">[35]</ref>, we have: </p><p>where &#119899;&#119899; = 2 &#215; &#119899;&#119899; &#119890;&#119890; (&#119899;&#119899; &#119890;&#119890; is the total number of nodes), and the standard deviation &#963; in the covariance matrix &#931; &#119894;&#119894; can be determined based on the relative error of the measurement (error%). For the measured value with a given mean &#120583;&#120583;, &#120583;&#120583; &#177; 3 &#8226; &#120590;&#120590; can cover more than 99.7% area of the Gaussian curve. For any measured value &#120567;&#120567;, &#120590;&#120590; can be calculated as follows <ref type="bibr">[13]</ref>:</p><p>2) The Model for Three-phase Unbalanced Systems For the three-phase unbalanced power systems, the AC power flow equations in <ref type="bibr">[36]</ref>  where &#119861;&#119861; &#119894;&#119894;&#119894;&#119894; denotes the state of the line from the i-th node to the j-th node, and</p><p>&#120572;&#120572; and &#120573;&#120573; are phase indexes; &#119901;&#119901; &#119894;&#119894; &#120572;&#120572; and &#119902;&#119902; &#119894;&#119894; &#120572;&#120572; are the active and reactive power injections of phase &#120572;&#120572; at the i-th node; &#119907;&#119907; &#119894;&#119894; &#120572;&#120572; and &#120579;&#120579; &#119894;&#119894; &#120572;&#120572; are the voltage amplitude and phase angle of phase &#120572;&#120572; at the i-th node; &#119892;&#119892; &#119894;&#119894;&#119894;&#119894; &#120572;&#120572;&#120572;&#120572; and &#119887;&#119887; &#119894;&#119894;&#119894;&#119894; &#120572;&#120572;&#120572;&#120572; are the conductance and susceptance between phase &#120572;&#120572; and &#120573;&#120573; on the line from the i-th node to the j-th node. Similar to the model for the single-phase case, the power flow equations for all the nodes in the network can also be expressed as follows:</p><p>; the definitions for &#119954;&#119954; &#119906;&#119906; , &#119959;&#119959; &#119958;&#119958; , and &#120637;&#120637; &#119958;&#119958; are similar to that of &#119953;&#119953; &#119906;&#119906; ; the power flow function &#119945;&#119945; u corresponds to a specified topology in a threephase unbalanced system. p &#119906;&#119906; &#65533;&#119909;&#119909; &#119894;&#119894; |&#119879;&#119879; &#119894;&#119894; ; &#120611;&#120611;&#65533; is used to denote the probability of &#119909;&#119909; &#119894;&#119894; given &#119879;&#119879; &#119894;&#119894; within parameter &#120611;&#120611; in a threephase unbalanced system, and the calculation process can be realized as that for p&#65533;&#119909;&#119909; &#119894;&#119894; &#65533;&#119879;&#119879; &#119894;&#119894; ; &#120611;&#120611;&#65533; in balanced systems, i.e., expressions ( <ref type="formula">14</ref>)~ <ref type="bibr">(18)</ref>.</p></div>
<div xmlns="http://www.tei-c.org/ns/1.0"><head>C. Real-Time Topology Identification</head><p>Based on the split-EM identification model, a large amount of historical data can be labeled. Then the classifiers for the real-time topology identification can be generated based on the labeled historical data using a series of machine learning methods. For each real-time measurement, its topology category will be labeled using the trained classifiers. The longer the collection time of the historical data is, the better the performance of trained classifiers will be, since more complete topology scenarios can be used in the training process.</p></div>
<div xmlns="http://www.tei-c.org/ns/1.0"><head>1) Credibility analysis of the labels</head><p>The identification result of the classifier should be further analyzed as the classifier is not applicable to the records with topologies that did not exist in the historical data samples and a classifier may also have error by itself. The credibility analysis can be performed based on the logarithm of the probability (expression <ref type="bibr">(18)</ref>) to determine if the label is credible, because the logarithm probability of a record belonging to the correct topology category is generally much larger than that belonging to a wrong one (more details will be presented in the case study section). Based on the result of the credibility analysis, the unreliable labeled data will be reidentified using the Bayesian recursion model.</p></div>
<div xmlns="http://www.tei-c.org/ns/1.0"><head>2) The Bayesian recursion based reidentification for unreliable labels</head><p>The Bayesian recursion model can be utilized to reidentify the real-time measurement with unreliable label <ref type="bibr">[13]</ref>. All the possible topology categories should be given in advance in the Bayesian recursion model. For a specified record, the iteration process can be expressed as follows:</p><p>where k is the iteration number, &#120634;&#120634; = [&#119864;&#119864; 1 , &#119864;&#119864; 2 , &#8230; , &#119864;&#119864; &#119872;&#119872; ] is the error vector and can be calculated using expression <ref type="bibr">(17)</ref>, and the original probability p&#65533;&#119879;&#119879; &#119894;&#119894; &#65533;&#120634;&#120634;&#65533; 1 , &#119895;&#119895; &#8712; [1,2, &#8230; , &#119872;&#119872;] are all preset to 1/M. After enough iterations are performed, the estimation will converge to one topology category, then this category will be chosen as the final topology category.</p><p>The labels of the real-time measurements passed the credibility analysis and error correction will be added to the historical labeled data, which will be utilized to update the classifiers training at a specific frequency to make the classifiers more accurate.</p></div>
<div xmlns="http://www.tei-c.org/ns/1.0"><head>IV. EXTENSION APPLICATION IN LARGE-SCALE NETWORK</head></div>
<div xmlns="http://www.tei-c.org/ns/1.0"><head>A. The Overall Application Process</head><p>As mentioned in section III-A, the calculation complexity of the split-EM method is closely related to the number of topology categories involved in the historical data. Then, for a large-scale network, an extension application solution can be employed through partitioning the network into several subsystems to reduce the calculation burden. The flowchart of the overall process is shown in Fig. <ref type="figure">4</ref>. Step1: The whole PDN is divided into Ns subsystems through the optimization model for subsystem formation (presented in subsection IV-B). The subsystem formulation can be decoupled from each other by exchanging the nodal voltage amplitudes and phase angles at the nodes of the connecting lines between subsystems, as the power flow equations for each subsystem can be expressed in the following:</p><p>where &#119945;&#119945; &#119946;&#119946; is the power flow function for the i-th subsystem; &#119953;&#119953; &#119946;&#119946; , &#119954;&#119954; &#119946;&#119946;, &#119959;&#119959; &#119946;&#119946; , &#120637;&#120637; &#119946;&#119946; are the active power vector, reactive power vector, voltage amplitude vector, and voltage phase angle vector at the nodes within the i-th subsystem, respectively; &#119959;&#119959; &#119836;&#119836;_&#119946;&#119946; , &#120637;&#120637; &#119836;&#119836;_&#119946;&#119946; are the voltage amplitude vector, and voltage phase angle vector at the nodes on the other side of the connecting lines between the i-th subsystem and other subsystems.</p><p>Step2: The topology identification process, including data processing, performing split-EM algorithm for historical data, training the classifers, and predicting the real-time topologies, is performed in each subsystem. The identification process is similar to that in Fig. <ref type="figure">1</ref>.</p><p>Step3: The historical and realtime topology identification results in each subsystem are transmitted to the distribution system operator (DSO) directly and combined together based on the time stamps. For the real-time identification, only the subsystem undergoing the topology change needs to update its real-time toplogy information, making the overall performance of the framework more efficient.</p><p>The advantage of this application solution in terms of the calculation complexity will be analyzed here. For a data sample consisting of N records, assuming that the number of the topology categories within the i-th subsystem is &#119872;&#119872; &#119894;&#119894; , then the largest number of the topology categories of the whole distribution network is &#8719; &#119872;&#119872; &#119894;&#119894; &#119873;&#119873; &#119904;&#119904; &#119894;&#119894;=1</p><p>. If the topology identification is performed in the whole distribution network, the calculation complexity in each iteration can be up to O(2N &#8719; &#119872;&#119872; &#119894;&#119894; &#119873;&#119873; &#119904;&#119904; &#119894;&#119894;=1</p><p>). While the total calculation complexity in each iteration can be expressed as O(2N&#8721; &#119872;&#119872; &#119894;&#119894; &#119873;&#119873; &#119904;&#119904; &#119894;&#119894;=1</p><p>) if the topology identification is performed in each subsystem. Based on the topology identification results of the subsystems and the acquisition time of the measurement, the topology information for the whole distribution network can be obtained by combining the results of the subsystems together. In most cases, O(2N&#8721; &#119872;&#119872; &#119894;&#119894; &#119873;&#119873; &#119904;&#119904; &#119894;&#119894;=1</p><p>) is much less than O(2N &#8719; &#119872;&#119872; &#119894;&#119894; &#119873;&#119873; &#119904;&#119904; &#119894;&#119894;=1</p><p>), which means that the partitioning scheme adopted here can drastically reduce the calculation burden.</p></div>
<div xmlns="http://www.tei-c.org/ns/1.0"><head>B. The Optimization of Subsystem Formation</head><p>For a simple system, we may evenly divide it into several subsystems artificially considering the estimated identification time in each subsystem for step1 in Fig. <ref type="figure">4</ref>. However, it may not be easy to divide a complex system with a mass of nodes and loops. In this case, the formation of the subsystems are important for the overall application process. Too many subsystems will lead to the increase of information interaction between subsystems, and over large subsystems caused by uneven partition or too few subsystems will limit the reduction in the identification time for the whole area. Therefore, an optimization of the subsystem formation is nessesary to further improve the performance of the whole application process in Fig. <ref type="figure">4</ref>. The optimization for the subsystem formation is modeled as follows:</p><p>&#119873;&#119873; &#119894;&#119894; +&#119873;&#119873; c_&#119894;&#119894; &#8804; &#119873;&#119873; limit &#119873;&#119873; s_&#119894;&#119894; &#8804; &#119873;&#119873; s_limit <ref type="bibr">(26)</ref> where the objective in the optimization is to minimize the total number of connecting lines (also reflecting minimizing the number of subsystems), and &#119862;&#119862; &#119894;&#119894; is the connecting line indicator. &#119862;&#119862; &#119894;&#119894; = 1 means the i-the line is a connecting line, &#119862;&#119862; &#119894;&#119894; = 0 means not. The interconnected subsystems can be formed supposing that all connecting lines are removed, and two constraints are considered in each subsystem: the number of nodes in the j-th subsystem (&#119873;&#119873; &#119894;&#119894; +&#119873;&#119873; c_&#119894;&#119894; ) is less than &#119873;&#119873; limit , and the number of unknown states in the j-th subsystem (&#119873;&#119873; s_&#119894;&#119894; ) is less than &#119873;&#119873; s_limit . To be noticed, the number of nodes on the other sides of the connecting lines (&#119873;&#119873; c_&#119894;&#119894; ) for the j-th subsystem is also considered for the calculation of the j-th subsystem, and the lines with unknown states are not used as the connecting lines here. &#119873;&#119873; limit and &#119873;&#119873; s_limit can be determined according to the empirical topology identification time with different system scales and unknown state numbers (more details can be found in Section V). The optimization model can be solved based on graph related algorithms and intelligent optimization algorithms.  </p></div>
<div xmlns="http://www.tei-c.org/ns/1.0"><head>Real-time Identification</head></div>
<div xmlns="http://www.tei-c.org/ns/1.0"><head>Historical Data Identification</head></div>
<div xmlns="http://www.tei-c.org/ns/1.0"><head>Whole System Identification</head></div>
<div xmlns="http://www.tei-c.org/ns/1.0"><head>Historical Data Identification</head><note type="other">Historical</note></div>
<div xmlns="http://www.tei-c.org/ns/1.0"><head>V. CASE STUDIES</head></div>
<div xmlns="http://www.tei-c.org/ns/1.0"><head>A. Historical Topology Identification in IEEE 33-bus System</head><p>In the actual operation of PDNs, the basic topology information can be obtained through the GIS (Geographic Information System), and the states of unmonitored switches need to be identified. The verification of the topology identification mainly focuses on the identification of the states of unmonitored switches in this section. The proposed topology identification model is applied in the IEEE 33-bus system as shown in Fig. <ref type="figure">5</ref>. In this paper, it is assumed the following lines' connection states are unknown (i.e., the lines with unmonitored switches): line 11-12, line 14-15, line 15-16, line 2-19, line 28-29, line 8-21, line 9-15, line 12-22, line 18-33, line 25-29 (the numbers are the end-nodes' serial numbers of the lines), and the lines with unknown connectivity are shown as dotted lines and numbered from 1 to 10 as shown in Fig. <ref type="figure">5</ref>. There are 2 10 =1024 possible topologies in this test system. The voltage of bus 1 in the PDN is 12.66 kV. Except for the first bus, the nodal active/reactive power injections in the PDN are randomly generated within predefined ranges, and the average values for the active and reactive power are 120 kW and 80 kVar respectively. The nodal voltage amplitudes and phase angles (except for the first bus) and the first bus's power injections in the PDN are generated using the Matpower toolbox in MATLAB <ref type="bibr">[37,</ref><ref type="bibr">38]</ref>. Measurement errors are randomly generated and added to the above generated data. According to the American National Standard Institute (ANSI) C12.20 Standard <ref type="bibr">[39]</ref>, the standard deviations of errors (in terms of p, q, v, &#952;) are all set to be 0.1% of the measurements (we use 0.1% in the text below for simplicity), and the error of each measurement is generated based on its error standard deviation and limited by three times of the standard deviation (i.e., &#120576;&#120576; &#8804; &#177;3 &#8226; &#120590;&#120590;). In this case, error% is 0.3%, which satisfies the accuracy standard in <ref type="bibr">[39]</ref>. The error settings are also applicable to other parts in the case study except for the sensitivity analysis of the measurement errors. The MATLAB software package is employed to solve the split-EM model and generate classifiers based on the labeled historical data. 1) The application in different topology types</p></div>
<div xmlns="http://www.tei-c.org/ns/1.0"><head>&#8226; The application in radial networks</head><p>Here the topology identification is performed for a data sample including 100 records. There are 4 topology categories (all of them are radial networks) in this data sample, i.e., T1, T2, T3, T4, corresponding to records 1~50, 51~80, 81~95, and 96~100, respectively. The ralated information of the sample are listed in Table <ref type="table">II</ref>. </p></div>
<div xmlns="http://www.tei-c.org/ns/1.0"><head>Topology category</head><p>The sequential states of the switches*</p></div>
<div xmlns="http://www.tei-c.org/ns/1.0"><head>Record numbers</head></div>
<div xmlns="http://www.tei-c.org/ns/1.0"><head>Record proportion T1</head><p>[1111100000] 1~50 50% T2</p><p>[1110110000] 51~80 30% T3</p><p>[1011101000] 81~95 15% T4</p><p>[0111100100] 96~100 5%</p><p>* For the state of the switch, "1" means the switch is closed, while "0"</p><p>indicates it is open.</p><p>The OPTI toolbox and NOMAD solver <ref type="bibr">[40,</ref><ref type="bibr">41]</ref> are used to solve the non-convex optimization in the split-EM solving process. The initial states of switches are all set to 1, and this setting is also used in other cases in the case study section. The results of the split-EM process for the above mentioned case are shown in Table <ref type="table">I</ref>. The scenarios with and without nodal voltage phase angles are both verified (denoted as Scenario 1 and Scenario 2, respectively). As shown in Table <ref type="table">I</ref>, the topology identification in both scenarios experiences 4 rounds in the split-EM processes, and the split-EM processes can efficiently identify all the topologies in the historical records, even for category T4 with only 5 records. In each round, the topology category with smallest Jindex is chosen to be split in the next round, while the other topology categories remain the same. As there is a zero element in &#120630;&#120630; within Scenario 1 and two repeated topology categories in T* within Scenario 2 when k=4, the split-EM processes stop according to the realization procedure in Fig. <ref type="figure">3</ref>. The logarithmic likelihood values increase with the split-EM processes in both scenarios, as more correct topologies are recognized. Although the logarithmic likelihood values in Scenario 2 are much smaller than those in Scenario 1, the topology categories and which category each record belongs to can also be identified correctly.</p></div>
<div xmlns="http://www.tei-c.org/ns/1.0"><head>&#8226; The application in the network with meshes</head><p>In this section, a data sample including the meshed topology is verified. Each record in the data sample is generated using the same process as described previously, but different topologies are used when calculating power flows using the Matpower toolbox in MATLAB. The data sample generation in the network with islands in the following section is also similar. There are 2 topology categories in this data sample, i.e., T1 (1111100000) and T2 (1111110001, with mesh), corresponding to records 1~50 and 51~80 respectively, and the identification results are listed in Table <ref type="table">III</ref>. The split-EM process is similar with that in Table <ref type="table">I</ref>), and the identification results are all correct in this case. &#8226; The application in the network with islands</p><p>In this section, a data sample including topology with island is verified. T1 (1111100000) and T2 (0111000010, with island) correspond to records 1~50 and 51~80 respectively, and the identification results are listed in Table <ref type="table">IV</ref>. The topology identification results are also all correct in this case. 2) Sensitivity analysis of line parameters and measurement errors In this section, we test 400 records corresponding to 4 topology categories ([1111100000], [1011101000], [01111 00100], [1111000001], and 100 records for each topology) to analyze the sensitivities of the line parameters and measurement errors by adjusting the amplitudes of the parameter variations and the standard deviations of the errors. As the accuracy of the split-EM method mainly depends on whether the logarithmic probability of a record within the correct topology is the largest, &#119878;&#119878; index in expression ( <ref type="formula">27</ref>) is designed and utilized to reflect the sensitivity of the line parameters and measurement errors.</p><p>where N is the number of the records, K is the number of parameter error sets or measurement error sets; &#119909;&#119909; &#119894;&#119894;&#119896;&#119896; (&#119879;&#119879; c ) is the record corresponding to topology &#119879;&#119879; c , while &#119879;&#119879; &#119894;&#119894; corresponds to the j-th topology category among all the topology categories.</p><p>In this study, 20 cases of error standard deviations and 23 cases of parameter variation ranges are considered, and 100 parameter error sets or measurement error sets are randomly generated for each case of the error standard deviation or parameter variation range. The sensitivity analyzing results are shown in Fig. <ref type="figure">6</ref>. According to Fig. <ref type="figure">6</ref>, &#119878;&#119878; index is more sensitive to the standard deviations of the measurement errors compared with the parameter errors of the lines in the PDN. It is also found that no two topology categories have the same probability for a specified record in the calculation process. It means there is only one maximum value of the logarithmic probability among all the topology categories. When the standard deviation of the measurement errors is within 0.1% <ref type="bibr">[39]</ref>, &#119878;&#119878; index corresponding to each standard deviation case is nearly equal to 1, indicating the results of the split-EM method are authentic with the practical measurement errors. </p></div>
<div xmlns="http://www.tei-c.org/ns/1.0"><head>B. Real-time Identification in IEEE 33-bus System</head><p>1) The real-time identification based on the classifiers It is assumed that 24 topology categories are involved in the historical data in this case. 1000 records of each topology category (24000 in total) are used to be trained, and 1000 records are used in the testing process. Among the 1000 testing records, the topology of 20 records is not included in the historical data (the 20 records belong to one topology, <ref type="bibr">[1101100010]</ref>). The Classification Learner and Neural Net Pattern Recognition toolboxes in MATLAB are adopted here to generate the trained classifiers. Among all the classification learner models, the Fine Tree, Linear SVM, Quadratic SVM, and Neural Network (using the Neural Net Pattern Recognition toolbox), etc., perform much better than the others in the toolbox, and the training/testing accuracy and prediction time of these models for a single record are listed in Table <ref type="table">V</ref>. 2) Credibility analysis and error corrections In this section, taking Quadratic SVM as an example, the prediction results will be analyzed and corrected. The logarithmic probability of each record with the topology category identified by the Quadratic SVM is shown in Fig. <ref type="figure">7</ref> (a). As the topology category for the records from the 381st to the 400th doesn't exist in the historical data, their logarithmic probabilities are much smaller than other records. Thus, we can obtain a threshold value of the logarithmic probability based on a mass of data considering the correct topology and wrong topologies. The threshold value can be used to determine whether an unreliable topology is assigned to a data record.</p><p>Here we set the threshold as -50, and the records from the 381st to the 400th are regarded as unreliable ones and are reidentified using the Bayesian recursion model, which involves all possible topology categories (the number is 2 10 =1024). The Bayesian method costs 6.09 sec for each record, and the topology identification results are all correct for these 20 data records, as shown in Fig. <ref type="figure">7 (b</ref>). After the error correction process, the accuracy has been improved from 97.9% to 99.9%, which is accurate enough for industrial applications.  As shown in Table <ref type="table">VI</ref>, with the number of the topology categories in training increasing, the training/prediction time tends to increase, while the training/testing accuracy decreases. Then the historical identification process not only provides useful topology information for the DSO to support the optimal operation and planning of the distribution network, but also reduces the number of the topology categories, which could shorten the prediction time and improve the prediction accuracy in the real-time topology identification. It is reasonably assumed that most topology categories have appeared in historical data for the distribution networks that are in operation for a long time. The topologies that were never occurred can be identified through the credibility analysis and error correction process, which is also helpful for the proposed models to be deployed in distribution networks which have been in operation for a short time.</p></div>
<div xmlns="http://www.tei-c.org/ns/1.0"><head>C. Application in a Three-phase Unbalanced System</head><p>The proposed topology identification model for three-phase unbalanced networks is applied in a pratical distribution system as shown in Fig. <ref type="figure">8</ref>. The states of the switches/lines directly connected to the transformer stations are monitored in practice and need not to be identifed. The lines with unknown connection states are marked using circled numbers in Fig. <ref type="figure">8</ref>. As the topology identification focuses on the medium-voltage networks, the measurement points are set at the incoming lines of distribution transformers, which can be regarded as aggregated load points in the PDN model. The nodal currents, voltages and power-factor angles of each phase are measured and used in this test case, and active and reactive power injections are calculated before the topology identification. It can be noticed that the loads are unbalanced between the three phases at each node, and the nodal voltage phase angles of each phase are not necessary in this actual case. 1) The historical topology identification The topology identification is performed on a data sample including 30 records. There are 2 topology categories (both of them are radial networks) in this data sample, i.e., T1 (0000001), T2 (1000000), corresponding to records 1~15 and 16~30, respectively. The identification results are listed in Table <ref type="table">VII</ref>, and the identification results are all correct. 2) The real-time topology identification It is assumed that 6 topology categories are involved in the historical data in this case. 200 records of each topology category (1200 in total) are used to be trained, and 240 records are used in the testing process. The Classification Learner toolbox in MATLAB are adopted to generate the trained classifiers. Among all the classification learner models, the models with better performances are listed in Table VIII, as well as the training/testing accuracy and prediction time (per record) of these models.</p></div>
<div xmlns="http://www.tei-c.org/ns/1.0"><head>D. Application of the Large-scale Network</head><p>The proposed topology identification method is also tested on the modified 135-bus test system <ref type="bibr">[42,</ref><ref type="bibr">43]</ref> as shown in Fig. <ref type="figure">9</ref>. It is assumed that the historical identification is conducted in the end of the day in this case, and the data are collected every 15 minutes, which means there are about one hundred data records for a day. Considering different settings of number of nodes and number of unknown states in the system, Table <ref type="table">IX</ref> shows time consumption of the empirical historical topology identification with a data sample involving 100 records and two topologies (assuming that the cases with one or two topologies are the most likely scenarios within a data sample of a day). It can be observed that the historical topology identification time is affected by both the number of nodes and the number of unknown states in the system. More nodes and more unknown states will both increase the identification time.  For the test system in Fig. <ref type="figure">9</ref>, it is assumed that the historical identification is required to be finished within 5 minutes. Therefore, &#119873;&#119873; limit and &#119873;&#119873; s_limit are set as 60 and 4 according to Table <ref type="table">IX</ref>, and the subsystems are highlighted by different background colors in Fig. <ref type="figure">9</ref>. The proposed topology identification model can be used directly in each subsystem based on the power flow equations in <ref type="bibr">(25)</ref>. Taking subsystem A1 (highlighted in blue color) as an example, nodes 2~50 are within subsystem A1, and nodes 1, 60, and 99 are the nodes on the other side of the connecting lines of subsystem A1. The nodal active/reactive power injections at nodes 2~50, and the nodal voltage amplitudes/phase angles at nodes [1~50, 60, 99] are measured. In this way, the subsystems are decoupled from each other, and the proposed split-EM process and real-time prediction can be adopted in each subsystem. The split-EM process and real-time prediction are tested for the whole area and the subsystems. The results are presented and compared as follows.</p></div>
<div xmlns="http://www.tei-c.org/ns/1.0"><head>1) The historical topology identification</head><p>The testing data for the 135-bus system are shown in Table <ref type="table">X</ref>. There are 12 lines in the entire system whose connection states are unknown, and each subsystem holds 4 of them. It is assumed that each subsystem has 2 topology categories and the whole area has 5 topology categories within the testing data, which includes 100 records. The states of the switches of each topology category, and the topology category of each record are presented in Table X and Fig. <ref type="figure">10</ref>.  The split-EM procedure in Fig. <ref type="figure">3</ref> is utilized in the whole area and all the subsystems, respectively. The corresponding split-EM processes are shown in Fig. <ref type="figure">11</ref> and Fig. <ref type="figure">12</ref>. Although the results are correct in both scenarios, the split-EM process for the entire system needs 5 rounds and the average calculation time of each round is about 2000 seconds, while it only takes 2 rounds in each subsystem and the total calculation time of each subsystem is just about 150 seconds on average. 2) The real-time topology identification In this section, the real-time identification processes of the whole area and the subsystems will be compared. We consider 4 topology categories in each subsystem and 12 topology categories in the whole area involved in the historical data in this testing. 12000 records are used in the training process for the whole area and each subsystem, and 1200 records are used in the testing process. The comparison results are shown in Table <ref type="table">XI</ref>. As shown in Table XI, the training/prediction time of the whole area is longer than those of the subsystems. The training accuracy difference between each subsystem and the whole area is within &#177; 0.5%, and the testing accuracy of subsystems are a bit higher than that of the whole area.</p><p>In conclusion, the performance of both the historical and real-time identification in the subsystems is as good as that in the whole area in terms of accuracy, and better in terms of identification time. After the topology identification of each subsystem is done, the topology information of the whole area can be obtained by combining the results of the subsystems based on the acquisition time of the measurements.</p><p>3) Subsystem optimization in the 874-bus system Fig. <ref type="figure">13</ref>. Subsystem optimization result of the 874-bus system.</p><p>Asides from the 135-bus system, an 874-bus system (as shown in Fig. <ref type="figure">13</ref>) is used to validate the model in subsection V-B. GA and graph related toolbox <ref type="bibr">[44,</ref><ref type="bibr">45]</ref> are utilized in the Matlab environment to realize the optimization of the subsystems of the 874-bus system, and &#119873;&#119873; limit and &#119873;&#119873; s_limit are set as 80 and 5. The optimized subsystem formation result is shown in Fig. <ref type="figure">13</ref>, and 15 subsystems are formed according to the optimization. The optimized subsystems are marked with different colors, and the edge with two terminal nodes in different colors are the connecting lines between the subsystems. The topology identification tasks in each subsystem are performed similarly to those in the 135-bus system, and will not be presented due to limitation of space.</p></div>
<div xmlns="http://www.tei-c.org/ns/1.0"><head>VI. CONCLUSION</head><p>To improve the topology observability in the PDN, a twostage topology identification framework is designed to recognize the mixed topologies in the historical batch data and predict the real-time topology. A split expectationmaximization (EM) method is proposed to deal with the topology identification problem of a large set of historical data in which the number of topology categories is unknown. The calculation complexities are compared between the split-EM and traditional EM methods, proving that the proposed split-EM method consumes less calculation resources in most cases. To predict the real-time topology efficiently, the topology classifiers are trained based on the labeled historical records through machine learning methods. An error-correcting mechanism consisting of the credibility analysis and reidentification process based on the Bayesian recursion model is also proposed for the real-time identification to improve its performance. The effectiveness of the models is verified in a test system. The proposed split-EM identify the categories correctly in cases for radial network and the with meshes islands, and works well when the nodal phase angles are not The model is also extended to adapt to the three-phase unbalanced systems. For the real-time topology identification, several highlyaccurate classifiers are generated using the Classification Learner and Neural Net Pattern Recognition toolboxes in MATLAB, and their prediction time for a single case is all less than 0.4 sec. Taking the classifier based on the Quadratic SVM model as an example, the error-correcting mechanism is verified in terms of improving the real-time prediction accuracy from 97.9% to 99.9%. The sensitivity of the topology categories is also analyzed, and the results show that reducing the number of topology categories in the historical identification will benefit real-time identification in terms of reducing prediction time and improving prediction accuracy. In addition, the application solution of the topology identification models in large-scale PDNs is proposed without extra measurements, which can update the overall topology information dynamically and efficiently with less calculation burden. The application in the 135-bus system has verified the advantages of the proposed extension framework both in historical and real-time identification. In the future, the proposed models in the paper can be further expanded to address other related issues, such as the real-time topology identification combined with fault detection and localization.</p></div></body>
		</text>
</TEI>
