- Home
- Search Results
- Page 1 of 1
Search for: All records
-
Total Resources1
- Resource Type
-
0001000000000000
- More
- Availability
-
01
- Author / Contributor
- Filter by Author / Creator
-
-
Abkenar, Forough Shirin (1)
-
Ferdousi, Sifat (1)
-
Gao, Ruoxuan (1)
-
Ibrahimi, Mëmëdhe (1)
-
Kalkunte, Ramanuja (1)
-
Mukherjee, Biswanath (1)
-
Tornatore, Massimo (1)
-
#Tyler Phillips, Kenneth E. (0)
-
#Willis, Ciara (0)
-
& Abreu-Ramos, E. D. (0)
-
& Abramson, C. I. (0)
-
& Abreu-Ramos, E. D. (0)
-
& Adams, S.G. (0)
-
& Ahmed, K. (0)
-
& Ahmed, Khadija. (0)
-
& Aina, D.K. Jr. (0)
-
& Akcil-Okan, O. (0)
-
& Akuom, D. (0)
-
& Aleven, V. (0)
-
& Andrews-Larson, C. (0)
-
- Filter by Editor
-
-
& Spizer, S. M. (0)
-
& . Spizer, S. (0)
-
& Ahn, J. (0)
-
& Bateiha, S. (0)
-
& Bosch, N. (0)
-
& Brennan K. (0)
-
& Brennan, K. (0)
-
& Chen, B. (0)
-
& Chen, Bodong (0)
-
& Drown, S. (0)
-
& Ferretti, F. (0)
-
& Higgins, A. (0)
-
& J. Peters (0)
-
& Kali, Y. (0)
-
& Ruiz-Arias, P.M. (0)
-
& S. Spitzer (0)
-
& Sahin. I. (0)
-
& Spitzer, S. (0)
-
& Spitzer, S.M. (0)
-
(submitted - in Review for IEEE ICASSP-2024) (0)
-
-
Have feedback or suggestions for a way to improve these results?
!
Note: When clicking on a Digital Object Identifier (DOI) number, you will be taken to an external site maintained by the publisher.
Some full text articles may not yet be available without a charge during the embargo (administrative interval).
What is a DOI Number?
Some links on this page may take you to non-federal websites. Their policies may differ from this site.
-
Not AvailableNetwork operators tend to migrate multiband optical networks to wider bands by batch upgrade (i.e., with a pay-as-you-grow strategy affecting only a subset of links at a time). However, temporary interruptions of services routed along the fibers that require equipment upgrades can create significant service blocking, which can only be avoided with interim lightpath re-allocation during the upgrade period. To seamlessly upgrade the network from C+L to C+L+S bands, we propose a batch upgrade strategy to reduce the upgrade cost, and a band-selective re-allocation method during the upgrade period to minimize blocking probability (BP). Simulations on the US-24 topology demonstrate up to nearly 50% cost reduction and BP as low as 0.3%.more » « lessFree, publicly-accessible full text available May 6, 2026
An official website of the United States government
