skip to main content
US FlagAn official website of the United States government
dot gov icon
Official websites use .gov
A .gov website belongs to an official government organization in the United States.
https lock icon
Secure .gov websites use HTTPS
A lock ( lock ) or https:// means you've safely connected to the .gov website. Share sensitive information only on official, secure websites.


Title: A mathematical modeling approach for supply chain management under disruption and operational uncertainty
Abstract In this work, we proposed a two‐stage stochastic programming model for a four‐echelon supply chain problem considering possible disruptions at the nodes (supplier and facilities) as well as the connecting transportation modes and operational uncertainties in form of uncertain demands. The first stage decisions are supplier choice, capacity levels for manufacturing sites and warehouses, inventory levels, transportation modes selection, and shipment decisions for the certain periods, and the second stage anticipates the cost of meeting future demands subject to the first stage decision. Comparing the solution obtained for the two‐stage stochastic model with a multi‐period deterministic model shows that the stochastic model makes a better first stage decision to hedge against the future demand. This study demonstrates the managerial viability of the proposed model in decision making for supply chain network in which both disruption and operational uncertainties are accounted for.  more » « less
Award ID(s):
2217472
PAR ID:
10443324
Author(s) / Creator(s):
 ;  
Publisher / Repository:
Wiley Blackwell (John Wiley & Sons)
Date Published:
Journal Name:
AIChE Journal
Volume:
69
Issue:
4
ISSN:
0001-1541
Format(s):
Medium: X
Sponsoring Org:
National Science Foundation
More Like this
  1. Abstract Biomass supply chain performance is heavily affected by uncertainties stemming from supply, demand, or unexpected disruptions. Unlike petrochemical plants that use crude oil, biorefineries often have to deal with the uneven spatial‐temporal distribution of feedstock supply. The modular production strategy provides more flexibility in chemical manufacturing by allowing fast capacity expansion and unit movement. However, modeling and optimizing modular biomass supply chain under uncertainties becomes challenging due to high dimensionality and the existence of discrete decisions. This work optimizes the multiperiod biomass supply chain using the rolling horizon planning and two‐stage stochastic programming framework. We then applied generalized Benders decomposition to reduce the computational complexity of the stochastic mixed integer nonlinear programming supply chain optimization. Furthermore, the solution of the stochastic programming could be used to quantitatively describe the life‐cycle assessment uncertainties of the biomass supply chain performance, demonstrating seasonality and random variability. 
    more » « less
  2. The circular economy (CE) seeks to maintain products and materials at their highest utility and value. The organisational and governmental policy have seised onto the CE philosophy to advance socio-economic and environmental development. CE remains an essentially contested concept – making its utilisation as a foundation for managerial and policy decisions challenging. Circularity assessment has not been systematically adopted, especially within supply chain management. Using critical scholarly and practical evidential foundation, we proposed a comprehensive set of metrics that can be utilised in supplier selection, monitoring, and development for circularity. These metrics include the macro, meso, and micro levels. A group decision-making method integrating best-worst method (BWM), regret theory (RT), and dual hesitant fuzzy sets (DHFS) for circular economy and circularity (CEC) supplier evaluation and selection is introduced – providing instrumental value for the identified metrics typology. The proposed BWM-DHFE-RT integrative analytical method can accommodate decisionmaker psychological behavior under uncertainty while simultaneously capturing divergent or conflicting opinions of different decision-makers. An illustrative business scenario is utilized to demonstrate the application of the proposed method. Though the proposed CE performance metrics and methodology are used for CEC supplier management reasons they have broader applicability. Future research and application directions are discussed. 
    more » « less
  3. Ghate, A.; Krishnaiyer, K.; Paynabar, K. (Ed.)
    This study presents a two-stage stochastic aggregate production planning model to determine the optimal renewable generation capacity, production plan, workforce levels, and machine hours that minimize a production system’s operational cost. The model considers various uncertainties, including demand for final products, machine and labor hours available, and renewable power supply. The goal is to evaluate the feasibility of decarbonizing the manufacturing, transportation, and warehousing operations by adopting onsite wind turbines and solar photovoltaics coupled with battery systems assuming the facilities are energy prosumers. First-stage decisions are the siting and sizing of wind and solar generation, battery capacity, production quantities, hours of labor to keep, hire, or layoff, and regular, overtime, and idle machine hours to allocate over the planning horizon. Second-stage recourse actions include storing products in inventory, subcontracting or backorder, purchasing or selling energy to the main grid, and daily charging or discharging energy in the batteries in response to variable generation. Climate analytics performed in San Francisco and Phoenix permit to derive capacity factors for the renewable energy technologies and test their implementation feasibility. Numerical experiments are presented for three instances: island microgrid without batteries, island microgrid with batteries, and grid-tied microgrid for energy prosumer. Results show favorable levelized costs of energy that are equal to USD48.37/MWh, USD64.91/MWh, and USD36.40/MWh, respectively. The model is relevant to manufacturing companies because it can accelerate the transition towards eco-friendly operations through distributed generation. 
    more » « less
  4. Purpose In the buyer-supplier relationship of a high-technology enterprise, the concepts of trust and risk are closely intertwined. Entering into a buyer-supplier relationship inherently involves a degree of risk, since there is always an opportunity for one of the parties to act opportunistically. Purchasing and supply managers play an important role in reducing the firm's risk profile, and must make decisions about whether or not to enter into, or remain in, a relationship with a supplier based on a subjective assessment of trust and risk. Design/methodology/approach In this paper, the authors seek to explore how trust in the buyer-supplier relationship can be quantitatively modeled in the presence of risk. The authors develop a model of trust between a buyer and supplier as a risk-based decision, in which a buyer decides to place trust in a supplier, who may either act cooperatively or opportunistically. The authors use a case study of intellectual property (IP) piracy in the electronics industry to illustrate the conceptual discussion and model development. Findings The authors produce a generalizable model that can be used to aid in decision-making and risk analysis for potential supply-chain partnerships, and is both a theoretical and practical innovation. However, the model can benefit a variety of high-technology enterprises. Originality/value While the topic of trust is widely discussed, few studies have attempted to derive a quantitative model to support trust-based decision making. This paper advanced the field of supply chain management by developing a model which relates risk and trust in the buyer-supplier relationship. 
    more » « less
  5. Abstract Factory in a box (FiB) is an emerging technology that meets the dynamic and diverse market demand by carrying a factory module on vehicles to perform on-site production near customers’ locations. It is suitable for meeting time-sensitive demands, such as the outbreak of disasters or epidemics/pandemics. Compared to traditional manufacturing, FiB poses a new challenge of frequently reconfiguring supply chain networks since the final production location changes as the vehicle carrying the factory travels. Supply chain network reconfiguration involves decisions regarding whether suppliers or manufacturers can be retained in the supply chain or replaced. Such a supply chain reconfiguration problem is coupled with manufacturing process planning, which assigns tasks to each manufacturer that impacts material flow in the supply chain network. Considering the supply chain reconfigurability, this article develops a new mathematical model based on nonlinear integer programming to optimize supply chain reconfiguration and assembly planning jointly. An evolutionary algorithm (EA) is developed and customized to the joint optimization of process planning and supplier/manufacturer selection. The performance of EA is verified with a nonlinear solver for a relaxed version of the problem. A case study on producing a medical product demonstrates the methodology in guiding supply chain reconfiguration and process planning as the final production site relocates in response to local demands. The methodology can be potentially generalized to supply chain and service process planning for a mobile hospital offering on-site medical services. 
    more » « less