Aims.We aim to demonstrate that the presence and mass of an exoplanet can now be effectively derived from the astrometry of another exoplanet. Methods.We combined previous astrometry ofβPictoris b with a new set of observations from the GRAVITY interferometer. The orbital motion ofβPictoris b is fit using Markov chain Monte Carlo simulations in Jacobi coordinates. The inner planet,βPictoris c, was also reobserved at a separation of 96 mas, confirming the previous orbital estimations. Results.From the astrometry of planet b only, we can (i) detect the presence ofβPictoris c and (ii) constrain its mass to 10.04−3.10+4.53MJup. If one adds the astrometry ofβPictoris c, the mass is narrowed down to 9.15−1.06+1.08MJup. The inclusion of radial velocity measurements does not affect the orbital parameters significantly, but it does slightly decrease the mass estimate to 8.89−0.75+0.75MJup. With a semimajor axis of 2.68 ± 0.02 au, a period of 1221 ± 15 days, and an eccentricity of 0.32 ± 0.02, the orbital parameters ofβPictoris c are now constrained as precisely as those ofβPictoris b. The orbital configuration is compatible with a high-order mean-motion resonance (7:1). The impact of the resonance on the planets’ dynamics would then be negligible with respect to the secular perturbations, which might have played an important role in the eccentricity excitation of the outer planet.
more »
« less
The β Pictoris b Hill sphere transit campaign: II. Searching for the signatures of the β Pictoris exoplanets through time delay analysis of the δ Scuti pulsations
TheβPictoris system is the closest known stellar system with directly detected gas giant planets, an edge-on circumstellar disc, and evidence of falling sublimating bodies and transiting exocomets. The inner planet,βPictoris c, has also been indirectly detected with radial velocity (RV) measurements. The star is a knownδScuti pulsator, and the long-term stability of these pulsations opens up the possibility of indirectly detecting the gas giant planets through time delays of the pulsations due to a varying light travel time. We search for phase shifts in theδScuti pulsations consistent with the known planetsβPictoris b and c and carry out an analysis of the stellar pulsations ofβPictoris over a multi-year timescale. We used photometric data collected by the BRITE-Constellation, bRing, ASTEP, and TESS to derive a list of the strongest and most significantδScuti pulsations. We carried out an analysis with the open-source python package maelstrom to study the stability of the pulsation modes ofβPictoris in order to determine the long-term trends in the observed pulsations. We did not detect the expected signal forβPictoris b orβPictoris c. The expected time delay is 6 s forβPictoris c and 24 s forβPictoris b. With simulations, we determined that the photometric noise in all the combined data sets cannot reach the sensitivity needed to detect the expected timing drifts. An analysis of the pulsational modes ofβPictoris using maelstrom showed that the modes themselves drift on the timescale of a year, fundamentally limiting our ability to detect exoplanets aroundβPictoris via pulsation timing.
more »
« less
- Award ID(s):
- 1817099
- PAR ID:
- 10569376
- Author(s) / Creator(s):
- ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; more »
- Publisher / Repository:
- A&A
- Date Published:
- Journal Name:
- Astronomy & Astrophysics
- Volume:
- 687
- ISSN:
- 0004-6361
- Page Range / eLocation ID:
- A309
- Format(s):
- Medium: X
- Sponsoring Org:
- National Science Foundation
More Like this
-
-
Aims. Photometric monitoring of β Pic in 1981 showed anomalous fluctuations of up to 4% over several days, consistent with foreground material transiting the stellar disk. The subsequent discovery of the gas giant planet β Pic b and the predicted transit of its Hill sphere to within a 0.1 au projected separation of the planet provided an opportunity to search for the transit of a circumplanetary disk (CPD) in this 21 ± 4 Myr-old planetary system. We aim to detect, or put an upper limit on, the density and nature of the material in the circumplanetary environment of the planet via the continuous photometric monitoring of the Hill sphere transit that occurred in 2017 and 2018. Methods. Continuous broadband photometric monitoring of β Pic requires ground-based observatories at multiple longitudes to provide redundancy and to provide triggers for rapid spectroscopic follow-up. These include the dedicated β Pic monitoring bRing observatories in Sutherland and Siding Springs, the ASTEP400 telescope at Concordia, and the space observatories BRITE and the Hubble Space Telescope (HST). We search the combined light curves for evidence of short-period transient events caused by rings as well as for longer-term photometric variability due to diffuse circumplanetary material. Results. We find no photometric event that matches with the event seen in November 1981, and there is no systematic photometric dimming of the star as a function of the Hill sphere radius. Conclusions. We conclude that the 1981 event was not caused by the transit of a CPD around β Pic b. The upper limit on the long-term variability of β Pic places an upper limit of 1.8 × 10 22 g of dust within the Hill sphere (comparable to the ~100 km radius asteroid 16 Psyche). Circumplanetary material is either condensed into a disk that does not transit β Pic, condensed into a disk with moons that has an obliquity that does not intersect with the path of β Pic behind the Hill sphere, or is below our detection threshold. This is the first time that a dedicated international campaign has mapped the Hill sphere transit of an extrasolar gas giant planet at 10 au.more » « less
-
Abstract δScuti variables are found at the intersection of the classical instability strip and the main sequence on the Hertzsprung–Russell diagram. With space-based photometry providing millions of light curves of A-F type stars, we can now probe the occurrence rate ofδScuti pulsations in detail. Using the 30 minutes cadence light curves from NASA's Transiting Exoplanet Survey Satellite's first 26 sectors, we identify variability in 103,810 stars within 5–24 cycles per day down to a magnitude ofT= 11.25. We fit the period–luminosity relation of the fundamental radial mode forδScuti stars in the GaiaGband, allowing us to distinguish classical pulsators from contaminants for a subset of 39,367 stars. Out of this subset, over 15,918 are found on or above the expected period–luminosity relation. We derive an empirical red edge to the classical instability strip using Gaia photometry. The center where the pulsator fraction peaks at 50%–70%, combined with the red edge, agrees well with previous work in the Kepler field. While many variable sources are found below the period–luminosity relation, over 85% of sources inside of the classical instability strip derived in this work are consistent with beingδScuti stars. The remaining 15% of variables within the instability strip are likely hybrid orγDoradus pulsators. Finally, we discover strong evidence for a correlation between pulsator fraction and spectral line broadening from the Radial Velocity Spectrometer on board the Gaia spacecraft, confirming that rotation has a role in driving pulsations inδScuti stars.more » « less
-
Abstract Gaps in the exoplanet population, such as the Neptunian Desert, point to the importance of mass loss in sculpting the radii of close-in exoplanets. Young planets (<500 Myr) offer the opportunity to detect such mass loss while it is still strong, and to test models of the underlying physical processes. We search for evidence of an Hαtransit in high-resolution spectra of three young planets, HD 63433 b (400 Myr), DS Tuc A b (45 Myr), and HIP 67522 b (17 Myr) using HARPS-N, Magellan-PFS, and CHIRON, respectively. We validate our method by testing it on several photospheric lines less impacted by stellar variability. We find no evidence of a transit signal for HD 63433 b and DS Tuc A b (3σlimits of 0.9% and 0.3%, respectively). For HIP 67522 b, we detect significant excess absorption (3.44% ± 0.28%) aligned with the transit time, narrow compared to the stellar line, and blueshifted from the stellar rest frame. In combination, these suggest the signal is from the planet. However, stellar variation in the Hαline over the course of the observations is comparable in size to the transit signature and the duration is shorter than the photometric transit, so this detection requires confirmation. Our findings, and other recent results in the literature, suggest that planets younger than 50 Myr are more favorable for the detection of atmospheric escape with Hαobservations, though older populations might still show escape in other diagnostics.more » « less
-
Abstract Early in their lives, planets endure extreme amounts of ionizing radiation from their host stars. For planets with primordial hydrogen and helium-rich envelopes, this can lead to substantial mass loss. Direct observations of atmospheric escape in young planetary systems can help elucidate this critical stage of planetary evolution. In this work, we search for metastable helium absorption—a tracer of tenuous gas in escaping atmospheres—during transits of three planets orbiting the young solar analog V1298 Tau. We characterize the stellar helium line using HET/HPF, and find that it evolves substantially on timescales of days to months. The line is stable on hour-long timescales except for one set of spectra taken during the decay phase of a stellar flare, where absoprtion increased with time. Utilizing a beam-shaping diffuser and a narrowband filter centered on the helium feature, we observe four transits with Palomar/WIRC: two partial transits of planet d ( P = 12.4 days), one partial transit of planet b ( P = 24.1 days), and one full transit of planet c ( P = 8.2 days). We do not detect the transit of planet c, and we find no evidence of excess absorption for planet b, with Δ R b / R ⋆ < 0.019 in our bandpass. We find a tentative absorption signal for planet d with Δ R d / R ⋆ = 0.0205 ± 0.054, but the best-fit model requires a substantial (−100 ± 14 minutes) transit-timing offset on a two-month timescale. Nevertheless, our data suggest that V1298 Tau d may have a high present-day mass-loss rate, making it a priority target for follow-up observations.more » « less
An official website of the United States government

