- Home
- Search Results
- Page 1 of 1
Search for: All records
-
Total Resources1
- Resource Type
-
0001000000000000
- More
- Availability
-
10
- Author / Contributor
- Filter by Author / Creator
-
-
Conrado Borraz-Sanchez, Russell Bent (1)
-
#Tyler Phillips, Kenneth E. (0)
-
#Willis, Ciara (0)
-
& Abreu-Ramos, E. D. (0)
-
& Abramson, C. I. (0)
-
& Abreu-Ramos, E. D. (0)
-
& Adams, S.G. (0)
-
& Ahmed, K. (0)
-
& Ahmed, Khadija. (0)
-
& Aina, D.K. Jr. (0)
-
& Akcil-Okan, O. (0)
-
& Akuom, D. (0)
-
& Aleven, V. (0)
-
& Andrews-Larson, C. (0)
-
& Archibald, J. (0)
-
& Arnett, N. (0)
-
& Arya, G. (0)
-
& Attari, S. Z. (0)
-
& Ayala, O. (0)
-
& Babbitt, W. (0)
-
- Filter by Editor
-
-
& Spizer, S. M. (0)
-
& . Spizer, S. (0)
-
& Ahn, J. (0)
-
& Bateiha, S. (0)
-
& Bosch, N. (0)
-
& Brennan K. (0)
-
& Brennan, K. (0)
-
& Chen, B. (0)
-
& Chen, Bodong (0)
-
& Drown, S. (0)
-
& Ferretti, F. (0)
-
& Higgins, A. (0)
-
& J. Peters (0)
-
& Kali, Y. (0)
-
& Ruiz-Arias, P.M. (0)
-
& S. Spitzer (0)
-
& Sahin. I. (0)
-
& Spitzer, S. (0)
-
& Spitzer, S.M. (0)
-
(submitted - in Review for IEEE ICASSP-2024) (0)
-
-
Have feedback or suggestions for a way to improve these results?
!
Note: When clicking on a Digital Object Identifier (DOI) number, you will be taken to an external site maintained by the publisher.
Some full text articles may not yet be available without a charge during the embargo (administrative interval).
What is a DOI Number?
Some links on this page may take you to non-federal websites. Their policies may differ from this site.
-
The recent and rapid shift towards the increased use of natural gas for power generation has convinced both power grid operators and regulators that additional coordination between electric power and natural gas transmission is needed to ensure the reliable operation of both systems. We report on an ongoing modeling ef- fort for joint gas-grid expansion planning. We develop a Combined Electricity and Gas Expansion (CEGE) plan- ning model that determines least-cost network expan- sions for power and gas transmission in a way that endo- genizes the effects of expansion decisions on locational costs for electric power and natural gas deliveries. The CEGE model, which leverages recent advances in con- vex approximations for large-scale nonlinear systems, is illustrated on a new gas-grid test system topologically similar to the Northeastern United States. We show that the CEGE model is computationally tractable, and how the model might be used to jointly plan infrastructures to avoid extreme events such as the coincident gas-electric peaks experienced during the 2014 polar vortex.more » « less
An official website of the United States government

Full Text Available