Title: Joint sizing and placement of battery energy storage systems and wind turbines considering reactive power support of the system
A B S T R A C T The probabilistic and intermittent output power of Wind Turbines (WT) is one major inconsistency of these Renewable Energy Sources (RES). Battery Energy Storage Systems (BESS) are a suitable solution to mitigate this intermittency by smoothening WT’s output power. Although the main benefit of BESSs mentions as peak shaving and load-shifting, but in this research, it will verify that optimal placement and sizing them jointly with WTs can lead to more benefits like compensating the required system’s reactive power support from WTs. The reactive power size of WTs and BESSs will be derived from the result of the joint sizing and placement in this study, as well as their active power output to meet the load demand. This can facilitate WTs and BESSs contribution to cover the system’s required reactive power and their participation in the reactive power market and ancillary services. This paper also proposes new cost functions for both WTs and BESSs and minimizes their cost while ensuring minimal total loss (active and reactive) in the power distribution system. This can benefit both WTs’ and BESSs’ owners as well as system operators. Suitable placement and sizing of the WTs and BESSs can also improve the load bus voltage profiles, which can benefit the end-users, and will verify using the proposed optimization by different case studies on the 33 bus distribution system. The results of case studies ascertain the consistency of the proposed formulation for placement and sizing BESSs and WTs jointly, as well as other benefits to the power system, the power plant owners, and system operators.  more » « less
Award ID(s):
2039564
PAR ID:
10229158
Author(s) / Creator(s):
Editor(s):
Uwe Sauer, Dirk
Date Published:
Journal Name:
Journal of energy storage
ISSN:
2352-152X
Format(s):
Medium: X
Sponsoring Org:
National Science Foundation
More Like this
  1. This paper reports two extensions to the authors’ recent work on the design of an optimally robust topology detector for a power transmission circuit with uncertain loads. Such a detector was implemented as a linear discriminator for the IEEE 9-bus system to identify, with a sub-millisecond latency, the intact circuit, or any single open-circuited line, using only the phasor measurements at the generators’ terminals. The first extension aims to replace the previously required bounded uncertain load set by a load distribution that permits rarer measurement outliers. This problem is formulated and solved as a support vector classifier. The second extension explores the solvability of a linear discriminator for topology identification for larger power systems under a bounded uncertain load set. A measure of adequacy of the involved measurement network is introduced, under which a sensor placement problem is formulated for the addition of a minimum number of phasor measurement units to meet a prescribed level of topology identifiability. In this case, sensor placement, detector design, and detector performance and robustness are demonstrated on the IEEE 68-bus system. 
    more » « less
  2. Abstract This paper presents the genetic algorithm (GA) and particle swarm optimization (PSO) based frequency regulation for a wind‐based microgrid (MG) using reactive power balance loop. MG, operating from squirrel cage induction generator (SCIG), is employed for exporting the electrical power from wind turbines, and it needs reactive power which may be imported from the grid. Additional reactive power is also required from the grid for the load, directly coupled with such a distributed generator (DG) plant. However, guidelines issued by electric authorities encourage MGs to arrange their own reactive power because such reactive power procurement is defined as a local area problem for power system studies. Despite the higher cost of compensation, static synchronous compensator (STATCOM) is a fast‐acting FACTs device for attending to these reactive power mismatches. Reactive power control can be achieved by controlling reactive current through the STATCOM. This can be achieved with modification in current controller scheme of STATCOM. STATCOM current controller is designed with reactive power load balance for the proposed microgrid in this paper. Further, gain values of the PI controller, required in the STATCOM model, are selected first with classical methods. In this classical method, iterative procedures which are based on integral square error (ISE), integral absolute error (IAE), and integral square of time error (ISTE) criteria are developed using MATLAB programs. System performances are further investigated with GA and PSO based control techniques and their acceptability over classical methods is diagnosed. Results in terms of converter frequency deviation show how the frequency remains under the operating boundaries as allowed by IEEE standards 1159:1995 and 1250:2011 for integrating renewable‐based microgrid with grid. Real and reactive power management and load current total harmonic distortions verify the STATCOM performance in MG. The results are further validated with the help of recent papers in which frequency regulation is investigated for almost similar power system models. The compendium for this work is as following: (i) modelling of wind generator‐based microgrid using MATLAB simulink library, (ii) designing of STATCOM current controller with PI controller, (iii) gain constants estimation using classical, GA and PSO algorithm through a developed m codes and their interfacing with proposed simulink model, (v) dynamic frequency responses for proposed grid connected microgrid during starting and load perturbations, (vi) verification of system performance with the help of obtained real and reactive power management between STATCOM and grid, and (vii) validation of results with available literature. 
    more » « less
  3. Proper integration of energy storage systems (ESS) into existing or future grids will depend on the effectiveness of models which seek optimal placement and sizing at the transmission and distribution levels. Current literature reviews reveal sizing methodologies can be improved to ease infrastructure integration, and those works with models useful for planning focus solely on micro-grids, wind power and forecasting, photovoltaics, or small communities. It is of interest to create an efficient, reliable ESS sizing model for large scale grids that contains interpretable models, has less sensitivity due to low model uncertainty, yet still is dependable due to an imposed reliability criterion. This work determined the minimum feasible size ESS to satisfy reserve requirements for a power grid with a high penetration of renewable sources. Results showed imposing a reliability criterion through loss of load expectation (LOLE) and energy index of reliability (EIR) resulted in more conservative capacity needs. 
    more » « less
  4. Transmission expansion planning (TEP) plays a vital role in ensuring the reliable and efficient operation of power systems, especially with the growing demand for electricity and the integration of renewable energy sources. This paper focuses on applying unconventional high surge impedance loading (HSIL) lines in transmission expansion planning and compares their outcomes with conventional line-based transmission expansion planning. Starting with a 17 bus- 500 kV power system connected by a conventional transmission line, the objective is to connect a new load located in a new bus, bus #18, to the existing 17-bus power system via two approaches: using conventional lines and incorporating unconventional HSIL lines. By comparing the number of lines required for the conventional and unconventional approaches, maintaining almost identical conductor volume per circuit, the effectiveness of unconventional HSIL lines in TEP is evaluated where using only two unconventional HSIL lines is sufficient to connect 1000 MW load demand at bus 18 while three lines are required when using the conventional design. 
    more » « less
  5. Larger penetration of Distributed Generations (DG) in the power system brings new flexibility and opportunity as well as new challenges due to the generally intermittent nature of DG. When these DG are installed in the medium voltage distribution systems as components of the smart grid, further support is required to ensure a smooth and controllable operation. To complement the uncontrollable output power of these resources, energy storage devices need to be incorporated to absorb excessive power and provide power shortage in time of need. They also can provide reactive power to dynamically help the voltage profile. Energy Storage Systems (ESS) can be expensive and limited number of them can practically be installed in distribution systems. In addition to frequency regulation and energy time shifting, ESS can support voltage and angle stability in the power network. This paper applies a Jacobian matrix-based sensitivity analysis to determine the most appropriate node in a grid to collectively improve the voltage magnitude and angle of all the nodes by active/reactive power injection. IEEE 14, 24, and 123-bus distribution system are selected to demonstrate the performance of the proposed method. As opposed to most previous studies, this method does not require an iteration loop with a convergence problem nor a network-related complicated objective function. 
    more » « less